Big Company
#1 in Guatemala
65 years old
From experience
Quote

About the project

Step onto the largest overpass in Nicaragua
The overpass consists of two interlocking bridges, one 525 meters long and the other 440 meters long and 23 meters high. The structure features anti-seismic technology, and the project was inaugurated in November 2018.

ITM Group was responsible for manufacturing and installing the safety rails for both bridges. These are electrostatic powder-coated metal structures, offering increased resistance and durability, as well as a highly aesthetic finish.

Las Piedrecitas represents an icon in Nicaraguan construction

DESIGN
The structure of the railings installed on the «Las Pidrecitas» bridge was designed in accordance with the criteria established in the AASHTO LRFD 2010 specification (1) for the selection of vehicular railing systems on bridges.

BIM Methodology (Building Information Modeling)

MATERIALS
We select our local and global suppliers under high quality standards and that have certificates such as ISO 9001, ASTM or DIN E.

MANUFACTURING
Use of CNC machines
Just-in-time methodology
Cellular Manufacturing
Multi-skilled workers
Pull Production

How do we guarantee the quality of our products?
Supply chain control.
We have a quality control department that ensures compliance with established processes.
Management of laboratory tests.
Control of Adherence and Thickness of Galvanization.
Control in material measurements.
Control of local suppliers to guarantee the origin, quality, and safety of purchased products.
Materials based on ASTM standards with controlled compositions.
Computer Software.

Contact us

An advisor will contact you as soon as possible.

(+502) -6644 0000 
infor@grupoitm.net