The overpass consists of two intertwined bridges, one 525 meters long and the other 440 meters long and 23 meters high. The structure features seismic-resistant technology. The project was inaugurated in November 2018.
Grupo ITM was in charge of manufacturing and installing the safety railings for both bridges, which are metal structures electrostatically painted for greater resistance and durability, as well as a very aesthetic finish.
An advisor will contact you as soon as possible.
(+502) 6644 0000
ventas@grupo-itm.com