About the project

Step to the largest overpass in Nicaragua
The overpass consists of two interlocking bridges, one 525 meters long and the other 440 meters and 23 meters high, the structure has anti-seismic technology, the project was inaugurated in November 2018.

ITM Group was in charge of the manufacture and installation of the safety rails of both bridges, which are electrostatically painted metallic structures for greater resistance and durability as well as a very aesthetic finish.

Las Piedrecitas represents an icon in the construction of Nicaragua

DESIGN
The structure of the railings placed on the “Las Pidrecitas” bridge were designed in compliance with the criteria established in the AASHTO LRFD 2010 specification (1) for the selection of vehicular railing systems on bridges.

BIM Methodology (Building Information Modelling)

MATERIALS
We select our local and global suppliers under high quality standards and that have certificates such as ISO 9001, ASTM o DIN E

MANUFACTURING
Use of CNC machines
Just-in-time methodology
Cellular Manufacturing
Multi-skilled workers
Pull Production

How do we guarantee the quality of our products?
Supply chain control.
We have a quality control department that ensures compliance with the established processes.
Control of laboratory tests.
Control in the Adherence and thickness of the Galvanized.
Control in material measurements.
Control of local suppliers to guarantee the origin, quality and safety of the products purchased.
Materials based on ASTM standards with controls in their compositions.
Computerized Software.